Saint Laurent Footbridge

  • Historic site and monument

Built in 1837 and modernized in 1909, it is located where first bridge of the city (end of the 11th century) once stood. This original bridge was often destroyed by the Isère's rise in the water level.

The bridge was for a long time the only passageway over the Isere river. Until the floods of 1651, the old bridge featured a chapel of Our Lady and an animated wooden sculpture that rang out the hours.

In practice

Theme

  • Engineering structure,
  • Bridge

Time schedule

From 01/01/25 to 12/31/25

  • Monday :

    Open

  • Tuesday :

    Open

  • Wednesday :

    Open

  • Thursday :

    Open

  • Friday :

    Open

  • Saturday :

    Open

  • Sunday :

    Open

Go there

Latitude : 45.195073

Longitude : 5.730186

Height : 211

quai Xavier Jouvin
38000 Grenoble
Go there

Tramway A and B stop Hubert Dubedout Maison du Tourisme

Chambéry Grenoble Bourg-d'Oisans Bourgoin-Jallieu Vienne Lyon Valence Gap

Information mise à jour le 08/08/2019
par Office de Tourisme Grenoble Alpes

Logo Apidae